Following the strong growth from the Little Maker Cambodia project (2024), Clearwater Metal VN Joint Stock Company continues to expand its scale with the Factory No. 3 project. This project is a proud milestone, showcasing our position as a fully self-sufficient entity: Self-designing, self-calculating, and self-manufacturing the entire steel structure system for our own expansion.
1. Optimization from Design & Engineering
Leveraging a deep understanding of our own operational needs, Clearwater’s engineering team focused on optimizing the structural framework for Factory No. 3:
In-house Technical Solutions: Using specialized software to simulate real-world loads, ensuring absolute stability in all weather conditions while significantly saving on raw materials.
Precise Shop Drawings: Every connection detail was strictly controlled by our technical team to eliminate errors and ensure a perfect fit during on-site assembly.
2. Self-Sufficient & Modern Production Capacity
Producing our own steel structures for Factory No. 3 allowed Clearwater to fully control the project timeline and ensure consistent quality through a closed-loop process:
Precision CNC Fabrication: Our modern CNC cutting systems ensured that all steel components reached millimeter-level accuracy, meeting the strictest technical standards of the precision engineering industry.
Advanced Welding & Surface Treatment: Each weld was performed using automatic and semi-automatic technology for superior strength and aesthetics. The entire structure was shot-blasted and coated with high-quality protective paint to withstand demanding industrial environments.
3. Affirming Vision and Trust
The Factory No. 3 project proves that Clearwater Metal VN is not just a mechanical manufacturer, but a powerhouse capable of executing large-scale industrial projects. By producing for our own expansion, we have maximized quality control, optimized investment costs, and accelerated the timeline to bring the factory into operation.
PROJECT OVERVIEW
Project Name: Factory No. 3 - Clearwater Metal VN Joint Stock Company
Location: Rach Bap Industrial Park, Tay Nam ward, Ho Chi Minh City
Timeline: 2025
Total Steel Tonnage: 500 Tons
Scope of Work: Full-service in-house design, engineering calculations, and structural steel fabrication.